Digester and Blower Replacement

Customer Glacier Construction Co., Inc.
Owner:    Widefield Water and Sanitation District
Project:      Widefield Digester and Blower Replacement
Location:    460 Willow Springs Road, Widefield, CO

This project was a major upgrade to an existing wastewater treatment facility for the Widefield Water and Sanitation District. Ross Electric provided the electrical power systems and equipment connections for a new digester facility and a new blower for the plant.

Scope of work includes:

  • Electric service and power distribution
  • Motor control center and variable frequency drives (VFD)
  • Motor controls and connections
  • Instrumentation and connections
  • Interface to Scada system
  • Lighting
  • HVAC power and connections

During the project it became obvious that there were some gaps between the electrical and the controls designs. So during a project meeting to find a solution, Ross Electric stepped up and offered our control experience to handle the integration of the two systems in the field. As a result, the project was completed on schedule.

Project successfully completed 2007 (C8000)